Visualizing the state of projects using geometric figures

It’s possible to visualize the state of projects using data in the form of geometric figures. This data is obtained  from project performance and predictive analytics, and after calculations are performed it is put in terms of financial indicators.

The data signifies the amount, for example, of time, work and budget being completed with respect to their respective estimations. The data is represented in percentage for simple illustration purposes, but it could also be represented in normalized form for linearity relationships.

The calculations are obtained by linking real-time data activity and calculated ones such as estimates to completion for work, budget, and time, using both variance analysis and earned value methods.

The following table represents a specific instance of a portfolio management context. The portfolio consist of three projects actively being realized within their respective framework. The table below is derived from calculations based on real-time data and estimated ones.


Scope
Time
Budget
Project A
10%
30%
50%
Project B
70%
60%
100%
Project C
50%
70%
50%

Table 1

Using Excel spreadsheet it’s possible to represent this data graphically - in this case, it could be a triangle. This is because there are three variables for both the number of projects and the number of constraints, so it’s also symmetrical from both points of view.

Graph 1 

The geometric figure could change if, for example, instead of three, there are five projects being monitored with the same number of constraints (see Graph 2 below).


Scope
Time
Budget
Project A
10%
30%
50%
Project B
70%
60%
100%
Project C
50%
70%
50%
Project D
45%
60%
50%
Project E
50%
70%
90%
Table 2 

In this case, if the number of projects are used as reference to check against the values of the constraints, then the figure becomes a five-sided polygon (a pentagon).

Graph 2


Otherwise, if the number of constraints are used as reference to check against the projects, then it will be a triangle. So, in this case, there is no symmetry.

Graph 3 

Only the graphical information part should be interpreted and used to determine the state of projects (similar to a dashboard approach). The added value here is that visual interpretation is easy and efficient and, moreover, supportive in a quick decision making process.

From Table 1, the algorithm for this instance could be: 

Project A: at 30% of its time, consumed 50% of its budget and produced 30% of the work. 

Project B: at 60% of its time, consumed all its budget and produced 70% of the work. 

Project C: at 70% of its time, it used up 50% of its budget and produced 50% of the work. 

Although the constraints variables are correlated, linearity is based on how the work load is distributed throughout the project, for each project. 

The above example is relative to a specific instance ... a different instance will have different data. The data used in this example is only for illustration purposes.

This model is dynamic throughout the lifecycle of each project because the data is continuously processed (based on  real-time activity and calculated ones).

The best way to visualize the graph is through a web/mobile application from anywhere and anytime.

(See also Forecasting Project Costs using Variance Analysis and Multiple Projects Performance Analysis using the Earned Value Method).

N.B.- The number of variables to track and process define the shape of the graph, i.e., the geometric figure.

Popular posts from this blog

The differences between Project, Operation and Program

We said that a project is defined as a temporary endeavor that consumes resources, incurs cost and produce deliverables over a finite period of time to achieve a specific goal. They come in all shapes and sizes and can vary in length or complexity.

Operation type activities are similar to project activities in that they too produce deliverables, consume resources and incur cost. However they are on-going or repetitive in nature, hence they are not project activities or tasks. Some examples of operation activities are weekly maintenance of databases, paying invoices or help desk operations activities.

Programs are much larger than projects. They are made up of many projects and on going activities such as operation type activities and are similar to projects as they consume resources, incur cost and produce deliverables. However programs are more complex and include repetitive operation type activities such as maintenance work, facility administration etc, and are funded typically on a…

Forecasting Project Costs using Variance Analysis

One way to report on cost control and forecasting during project execution is to use the Variance Analysis method, that is, explaining the difference (or variance) between actual costs and the budgeted costs with numbers and make new estimates for completing the work. Please consult this link Earned Value Management for related literature and references.
For the purpose of making these calculations, I will use an hypothetical project example (but it could also be a task or phase). "A company has contracted a service provider to deliver a project in 10 working days (80 hours) for the estimated cost of $10,000 and a work effort of 200 hours. The contract is Time and Material, this means that the company pays the provider for the number of hours actually required to perform the service. So, the provider has no incentive to minimize the number of hours expended on the service. The less efficient the provider is, the more money it makes!"
Summary of Time and Material Contract (re…

Using PERT for estimating tasks

A simple way for estimating tasks is to use the PERT (Program Evaluation review technique) weighted average method. This method uses a weighted average duration estimate to calculate task duration, it gives the opportunity to take into account information based on different types of estimates values (such as poorly defined areas, probabilistics, and ranges for the schedule). This method is based on the Beta distribution model because it can model events which are constrained to take place within an interval defined by a minimum and maximum value. (For this reason, the Beta distribution is used extensively in PERT, CPM and other project planning/control systems to describe the time to completion of a task).


The term weighted average means that the equation uses weighted factors to calculate the expected task duration.
The equation and process modelling a task for PERT is the following:  E=(O+4M+P)/6 (equation)  E= Expected Value  O= Optimistic Value (this is equivalent to a minimum val…